Part of the original premises.
Part of the original premises.
The empty space remains in use under the present premises for ventilation and termite control purposes.
The empty space remains in use under the present premises for ventilation and termite control purposes.
The roof was changed into steel structure in 2002.
The bamboo scaffolding on the external walls marked the commencement of the construction work.
A technician repairs the studs.
A technician repairs the studs.
The main building was restored with new tiles roof.
The main building was restored with new tiles roof.
The attached premises were renovated and restored with new tiles roof.
A technician records the discovery of an original drainage ditch in the backyard.
The partition wall separating premises C and D was removed and the ground was newly paved there.
The interior of the main building was renovated.
The original brick walls of the main building are exposed as part of the present structure.